Product name | API 5L/ ASTM A53 ERW HFW Carbon Galvanized Steel Pipe for Building Material |
Out diameter | 26.7~660mm |
Wall Thickness | 1-20mm |
Length | 5.8m, 6m,12m or as per customers' requirement |
Pipe end | 1, Plain end carbon steel pipe 2, Bevel end carbon steel pipe 3, Thread with coupling and cap carbon steel pipe |
Surface | 1, Galvanized carbon steel pipe 2, Painted (Black or red painting) carbon steel pipe 3, Oil carbon steel pipe 4, Bared or as per customers' requirement |
Standard | API/ASTM/BS EN/DIN/GB |
Material | Q195,Q235B,Q345B,St37,St52,St35,SS400,S235JR,S275JR.S355JR etc |
Shipment | Container or Bulk vessel |
Package | by bulk; bundled with steel strip; outside with plastic cloth or PVC Bags |
Delivery time | 15-30 days after received the deposit |
Trade terms | FOB, CFR, CIF, EXW |
Payment term | T/T, L/C at sight |
Main Market | Middle East, Africa, South America, East, and West Europe, Southeast Asia |
Application | Steel Structure, Building Material, Scaffold Steel Pipe, Furniture Pipe, etc |
FAQ
Q: How many days can you deliver after confirmed the order?
A: For stock: within 5-7 days;
For customized product: around 30 days;
For special sizes: subject to negotiation.
Q: How does your company do quality control?
A: ISO 9001:2015 certified;
Product certificate as per EN10204 3.1 or 3.2 as per customer's request.
Q: Can I have a factory-visit?
A: Surely. All customers are welcome to visit us in China.
Q: Can I have a trial order?
A: Of course, it is an honor for us to have the opportunity to show our quality and service.