3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe

3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipeseamless butt-welded carbon steel pipe3 Inch 321H Stainless Steel Pipe Building Material Industrial PipeGrade304 304L 316 316L 309S 310 SizeOuter DiameterSeamless:17-914mm 3/8"-36"Wall Thickness2-60mm SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80Length

Featured Products

3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe
3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe
seamless butt-welded carbon steel pipe

3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe

Grade
304 304L 316 316L 309S 310
 
Size
Outer Diameter
Seamless:17-914mm 3/8"-36"
Wall Thickness
2-60mm SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
Length
1-12m as customer requirement
Ends
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded andcoupling,etc.
Surface Treatment
NO.1 NO.4 4K 8K BA 
Technical Methods
Hot-rolled/Cold-drawn/Hot-expanded
Testing Methods
Pressure test,Flaw detection,Eddy current testing, Hydrostatic testing or Ultrasonic
examination and also with chemical and physical property inspection
Third Party Inspection
SGS BV MTC
Trade Terms
FOB CIF CFR
Payment Terms
FOB 30%T/T,70% before shipment
CIF 30% pre-payment and the balance to be paid upon B/L (copy)
or Irrevocable 100% L/C at sight
3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe3 Inch 321H Stainless Steel Pipe Building Material Industrial Pipe3 Inch 321H Stainless Steel Pipe Building Material Industrial PipeFAQ
 

Q1Wonder if you accept small orders?

A1: Do not worry. Feel free to contact us.

 

Q2Can you send products to my country? 

A2: Sure, we can. If you do not have your own ship forwarder, we can help you. 

 

Q3Can you do OEM for me?

A3: We accept all OEM orders, just contact us and give me your spec.

 

Q4What's your payment terms ?

A4: By T/T,LC AT SIGHT,30% deposit in advance, balance 70%  before shipment.   

 

Q5How long is your production lead time?

A5:It depends on product and order qty. Normally, it takes us 7 days for an order with MOQ qty.

 

Q6When can I get the quotation ?

A7: We will quote you within 24 hours after we get your inquiry. 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours